SOLAR POWER (solar panels, electrical controllers, wiring, voltage transformers, outlets and lights).

 

2014. Nancy School for the Deaf in Lira. Enhanced and expanded the solar power systems with upgraded batteries and controllers. Installed outside lighting on the dormitories.

2013. Nancy School for the Deaf in Lira. Installed solar power in the girls’ dormitory and the boys’ dormitory. The lights made it possible for the students to communicate with sign-language at night.

2013. Bussi Island primary school. Installed solar power in the classroom building.

2011. God’s Grace primary school near Buyaga Village. Installed solar power in the administration building.

2010 December. Natamu Village primary school near Iganga. Installed solar power in the classroom building.

2010. December. God’s Grace primary school near Buyaga Village. Installed solar power in the administration building.

2010 June. Lukome Secondary School near Gulu. Installed solar power in the classrooms.

2010 June. Abilnino primary school near Gulu. Installed solar power for charging cell phones.

2008. Byana Mary Hill primary school and orphanage near Katigondo in Masaka District. Constructed a girl’s dormitory and installed solar power in the new dormitory.

2007. Byana Mary Hill primary school and orphanage near Katigondo in Masaka District. Enhanced the solar power and expanded the capacity.

2007. Byana Mary Hill Primary School and Orphanage near Katigondo. Installed solar power at the Administration Building.

2006 December. Byana Mary Hill primary school and orphanage near Katigondo in Masaka District. Installed solar power in the staff building, three classrooms and two children’s dormitories.

WELLS AND RAINWATER CATCHMENTS

2015. Mt. Trinity (Madam Sunday’s) Nursery School near Gulu. Installed auger-drilled well and hand pump at the school.

2015. Rural area near Mt. Trinity. Installed auger-drilled well and hand pump for the local residents.

2015. Small community on outskirts of Gulu. Installed auger-drilled well and hand pump.

2014. Buyaga Village. Installed a well using a combination of impact drilling and hand digging. Installed a hand pump.

2012. LADAP Co-op near Lira. Installed a 5 hp pump 300 feet of 2-inch HDPE pipe for irrigation. One-inch laterals and sprinklers were installed.

2011. God’s Grace primary school near Buyaga Village. Installed hand-dug well and hand pump on site.

2006 December. Byana Mary Hill primary school and orphanage near Katigondo in Masaka District. Installed a hand-dug well with a solar pump to transport water 250 feet uphill to a raised tank near the cooking area.

2006 December. Byana Mary Hill Primary School and Orphanage. Installed a rainwater catchment system and a 750 gallon storage tank.